Jun 132018
June monthly meeting
Excused- Bruce Englesby/ Dave Park
in attendance..
Elaine Dagnillo/ Don Scott/ Kirk Chugg/ Wes Whitehead/ John Dagnillo /
Neighbors also in attendance/ Bill & Janet (in Kendall’s old house) Mark Stull
agenda
- Road Presentation (Tim Biel, Ryan, PEPG CONSULTING L.L.C.) see engineering report provided for details
- Total rebuild not required as base seems to be good.
- Seal coat should be done every 5 years.
- Most expensive option needed for best result would be normal maintenance for the top half spot patch, seal coat, and complete new asphalt lower road.
- Least cost option is scrub seal, maybe helps for another 3-5 years.
- 2 inch overlay, 10-15 years $160k-$170k with fabric ~$190k +5 years on top of the 10-15.
- Inaction removes option and increases the cost of others.
- PEPG can provide map of work, and scope of work to provide to potential contractors
- Changing from 3″ to 4″ doubles the strength of the road.
- Vote to take action to repair whole upper section less east end of Jessy Creek and slurry seal whole upper, motion and passed vote.
- Vote to not fix lower half of Pole Patch, run to failure and spot repair as required, motion and passed vote.
- Next board meeting discuss an impact fee for new construction.(regarding road damage from heavy trucks)
- Non-permanent Structures
- Should meet the same requirements as an outbuildings. Send out in email and discussed in next HOA meeting.
- Gate
- New keypad and screen put in all functions and looks good.
- Water line was ran to the gate to water the flowers.
- Neighborhood Watch
- Don will set up meeting to talk about the correct way to handle trespassing etc.
- Water Violations (Don), The state has a new requirement for testing every week – water quality- we have never done that & need to find solution- Don is working with City to possibly take over our water system (for a fee)
- Shawn to send water spread sheet to board.
- Next meeting Tuesday July 10th.
29-June-2018 – addendum to June 6, 2018 board meeting
The board is requesting bids to move forward on items 9 and 10 under the Road Presentation above. We will proceed with the outlined repairs as quickly as possible.
Sorry, the comment form is closed at this time.